Adam S project
This customer was moving but before they could move they needed to bring the basement stairs up to code. The wall that had the handrail on it was to short and didn't meet code. KP Carpentry came in and built a small wall on top of the existing wall and then drywalled and sprayed a texture on the wall to match what was already there. After the wall texture had dried we re-installed the moulding on the top and sides of the wall to give the wall the finished look that it had.