Ask questions and get answers from experienced industry professionals
The difficulty depends on many things.
I would say PT post is the way to go, but install it over a post standoff past so water doesnt get trapped between the bottom of the post and whatever it is sitting on causing premature rot.
Not a difficult job at all. Depending on the details it can be done in a half a day. More details - more time.
WE concur with Jeff and Jason although as a company we LOVE none wood decorative posts or engineered productrs. We are in the SOUTH.