Ask questions and get answers from experienced industry professionals
The best move would be to simply make sure the existing vapor barrier product is installed properly (flush to ceiling below) and add blown insulation over top to to get the best R value and at the least expense.
No need for s econd mositure barrier which is what the paper-face is. Just roll out unfaced insualtion atop the existing. Or, as an option, rent a blower and use loose-fill insulation.